WilliamsEngineering,Inc.
  • Water Supply
  • Distribution
  • Facilities Plan
Water Engineering: Studies and Masterplans

WEI has performed studies involving evaluation of water rights, availability, current and projected usage, raw water supply lines and storage, treatment facilities, finished water storage tanks, distribution, water system network modeling and calibration for multiple pressure zones for domestic, fire flow, and combined flow, groundwater pumping systems, and wells.

Selected Projects


City Water Supply Upgrade Masterplan,
Central, CO

Performed water system study analyzing
water rights, water availability, current
and projected water usage, raw water
supply lines, raw water storage, treatment
facilities, and finished water storage and
distribution. Proposed improvements were
phased, with phase I consisting of over
$2,000,000.00 worth of improvements.

Water System Master Plan, Red Cliff,
CO
Performed study, including analysis of
water supply, usage, and leakage, with
recommendations for improvements and
design.

Grand Vista Subdivision, Grand
Junction, CO
Performed computer model water system
analyses and design for domestic and
fire flow in an elevated area.

Water System Modeling, Starlight
Pines, AZ
Evaluated 800-acre mountain resort
water system with several pressure
zones, wells, and storage tanks.
Utilized KYPIPE computer program in
analysis and design.

Water System Fire Flow Modeling,
Minturn, CO
Designed water distribution system for
a subdivision. Design required booster
station facility and fire flow analysis.
Utilized KYPIPE computer program.

Redlands Mesa Subdivision, Mesa
County, CO
Performed computer model water
system analyses for water distribution
system with 4 pressure zones and a
booster station.


Water System Modeling, Payson, AZ
Modeled mountain subdivision and
regional water system, including use
of proposed booster station. Utilized
KYPIPE computer program.

North Delta Water Tank Feasibility
Study, Delta, CO
Evaluate various tank sites with respect
to land ownership, geotechnical,
aesthetic, hydraulic, and pumping
considerations, and steel versus
concrete tanks.

Groundwater Discharge Line Analysis,
Yuma County, AZ
Project Engineer on study involving
stormwater and groundwater for an 80
square mile area. The U.S. Bureau of
Reclaimation had 14.6 miles of pressure
pipeline for conveying and discharging
pumped groundwater to control high
conditions. Through the years more
pumps were added without evaluation.
Prepared first computer model on the
system for pipe and 36 pumps and
evaluated sytem capacities and ideal
operation.

Spyglass Hill, Grand Junction, CO
Modeled and evaluated water system
pressure for domestic and fire flow in
an elevated area with two pressure
zones.

Norwood Water System Master Plan,
Norwood, CO
Performed comprehensive water system
Master Plan and Feasibility Study,
consisting of research of water rights,
water availability, raw water supply
and storage, treatment, and distribution,
including a full KYPIPE computer
program hydraulic model of the system.

For more information, Contact Us.

Last Updated December 2006.

Professional Custom Web Site Design & Ecommerce
Custom Web Site Design & Ecommerce

© Copyright 2009 Williams Engineering, Inc.. All Rights Reserved.